![]() |
![]()
|
|
Below are the first images of the stepped hull RIB under construction at Woody's Tingalpa workshop. The boat will be on the water by Christmas.
![]() |
![]() |
![]() |
|
The hull under construction |
|
![]() |
![]() |
![]() |
The intricate workmanship |
central to the superior design | The key to the stepped hull |
The 7.3 Naiad boat fitted out by Woody
Woody not only manufacture the shell of custom-built Naiad's they also install the electronics, do the fit out and take the boat on sea trials before it goes into commission.
![]() |
![]() |
![]() |
|
|
|
![]() |
![]() |
![]() |
|
|
Woody not only manufacture the shell of custom-built Naiad's they also install the electronics, do the fit out and take the boat on sea trials before it goes into commission.
![]() |
![]() |
![]() |
The boat ready for delivery |
Being trialled by Woody |
The volunteers at Point Danger |
![]() |
![]() |
![]() |
The boat is blessed |
Inspected yet again |
Even the Gold Coast Mayor |
Action pictures of the Naiad 7.3 at Point Danger
![]() |
![]() |
|
|